WorkspaceQuality & Maintenance
Interactive simulation · Quality & Maintenance command center
Good morning, Marisol.
A custom quality & maintenance operating system for a 42-employee precision-machining shop — NCR triage, preventive maintenance, and downtime risk in a single operating picture.
Open NCRs
7
+2 this week
On-hold lots
4
2 critical
Plant OEE
78.6%
-1.2pt WoW
PMs due
5
1 overdue
Scrap rate
2.1%
-0.4pt MoM
Downtime risk
High
5-Axis DMG
Quality holds
Non-conformance reports · 5 records
- NCRNCR-2024-089Housing 7075 · rev BDimensional out-of-spec (bore +0.003")Lot L-8842 · Qty 40 · Owner D. ChenDueNov 14Opened Nov 12OpenCritical
- NCRNCR-2024-088Bracket AL-6061 · rev CSurface finish defect (Ra 125 vs 63)Lot L-8839 · Qty 12 · Owner A. PatelDueNov 13Opened Nov 11In reviewMajor
- NCRNCR-2024-087Shaft SS-304 · rev AThread minor diameter lowLot L-8831 · Qty 6 · Owner R. OrtizDueNov 12Opened Nov 10ClosedMinor
- NCRNCR-2024-086Manifold PEEK · rev APorosity in weld lineLot L-8828 · Qty 4 · Owner D. ChenDueNov 11Opened Nov 9OpenMajor
- NCRNCR-2024-085Cover AL-6061 · rev FBurr on mounting edgeLot L-8825 · Qty 8 · Owner A. PatelDueNov 10Opened Nov 8ClosedMinor
3 active · 1 criticalSynced with inspection logs · 1 min ago